All projects

Networking · network security

Enterprise network labs: from VLANs to a secured multi-site design

Six labs that took me from my first VLAN to a complete multi-site network: an addressing plan built around real needs, a security policy turned into ACLs, and layer-2 protections. The screenshots are my own project files, with the notes I left when each test passed.

Period
July – September 2026
Status
Completed · lab work on my own, during my internship
Type
Personal project
  • Cisco Packet Tracer 8
  • Cisco IOS 15
  • VLAN / 802.1Q
  • Static · RIPv2 · OSPF
  • VLSM
  • Extended ACL
  • DHCP snooping · DAI

The project

After the networking lessons of my internship, I practiced on my own in Cisco Packet Tracer, in the order a network engineer works: interconnect, segment, route, filter. At each step I built the network, tested it, then tried to justify my choices (subnet sizes, routing protocol, where to put the filters). The last lab is a personal capstone: a complete multi-site network designed from business needs.

  • Labs 1–2: five VLANs (HR, Accounting, IT, Management, management VLAN 99) routed with Router-on-a-Stick over an 802.1Q trunk; then an extended ACL preventing the Sales VLAN from reaching Admin, and port security limiting each access port to one MAC address.
  • Lab 3: four remote sites in a serial loop, routed successively with static routes, RIPv2 and single-area OSPF.
  • Lab 4: VLSM split of 172.25.0.0/16 across three VLANs of different sizes, with inter-VLAN routing on a multilayer switch (SVIs) and DHCP.
  • Lab 5: a /24 redesigned with VLSM, three application servers, a security policy written as extended ACLs applied close to the source, unused ports shut, DHCP snooping and dynamic ARP inspection.
  • Lab 6: headquarters with eight segments (voice, guests, IT/SOC, accounting, cameras, servers, HR, management), a core multilayer switch with DHCP relay, pruned trunks, a voice VLAN on shared ports, and two branches over serial WAN links with OSPF.

What I did, and what went wrong

  • Before drawing anything, I start from questions: how many departments, how many devices in each, what growth over the next two years, what budget. The answers decide the subnet sizes.
  • I write the security policy as a simple table first (who, towards what, which service, allowed or not), then translate each line into an ACL. A manager never asks for an ACL; they ask that accountants should not see HR files.
  • Configured every device from the IOS command line and kept the configurations.
  • Sized lab 6 from estimated equipment counts: 196 devices plus about 50 % growth, around 368 addresses. A /24 (254 usable) was too small, a /23 (510) left no real margin, a /22 (1,022) fit with room to grow.
  • Wrote lab 5's policy as one ACL per source, for example: the Users VLAN may reach the DNS/web server on TCP 80, TCP 443 and UDP 53 only.
  • Alongside the six labs: a services lab with five dedicated servers (DHCP, DNS, web, FTP, mail), each configured and tested from the client machines, with a troubleshooting section for each service.

What went wrong

  • My first lab 5 plan cut the /24 into four equal /26 blocks. When two departments had to be added without interrupting the network, it no longer fit. I redid the plan with VLSM: two /27 user VLANs, a /26 for servers, a /27 for IT and a /30 for the router link.
  • Keeping layer 2 and layer 3 apart in my head: an ACL filters on IP addresses, port security on MAC addresses. They answer different threats and are not interchangeable.

How I checked it

What I wanted to prove, the test I ran, and what I actually saw.

What I wanted to proveThe testWhat I saw
Sales cannot reach Admin; one MAC per portConnectivity tests in the lab fileAnnotation left at test time: « Tout est OK ! Commercial ne peut pas communiquer avec admin »
Four sites reachable with each routing methodInter-site tests after static, then RIPv2, then OSPFAll three validated in turn (annotated in the project file)
Multi-site design works end to endInter-segment and HQ → branch tests; voice VLAN on a shared portEight segments communicate through the core; both branches reachable; voice VLAN operational
Packet Tracer: three VLANs (Admin, IT, Commercial) behind one switch and a 2911 router, with the note 'Tout est OK! Commercial ne peut pas communiquer avec admin'
Extended ACL and port security, with the note I left once the test passed.
Packet Tracer: four sites linked by serial links, with the note that static, RIP and OSPF configurations were tested and validated
Four sites routed three ways in turn: static, RIP, then OSPF.
Packet Tracer: three VLANs addressed with VLSM in 172.25.0.0/16, routed by a multilayer switch
VLSM and inter-VLAN routing on a multilayer switch.
Packet Tracer overview of lab 6: firewall, router and core switch serving eight color-coded segments
Lab 6: headquarters, eight segments behind the core switch.

Result

  • Six working topologies with their configurations, and an addressing plan where every subnet size is argued.
  • A concrete feel for routing trade-offs: static routing becomes heavy as networks multiply, RIP is simple but limited, OSPF is closest to a real enterprise network.

Limits and next steps

  • Simulation only (Packet Tracer), no physical equipment.
  • The raw outputs of the verification commands were not kept at the time. Results come from annotations in the project files and from screenshots of the active topologies, as the repository states.
  • All addresses are private simulation ranges with no link to a real infrastructure.

What I would do next

  • Keep the show command outputs as evidence for every future lab
  • Add IPv6 and centralized logging (syslog) to the multi-site design
  • Rebuild part of it on real or emulated IOS

Code and documents